SWAY

KEEP THE BRIDGE OPEN.

A storm is moving in.

You have 12 minutes until dawn and one suspension bridge that cannot stop doing its job.

Traffic keeps coming. Cars become buses. Buses become trucks. Trucks become heavy freight and armored vehicles. At the same time, the wind gets stronger, the bridge begins to move, structural pressure spreads across five independent zones, and every decision costs money.

Your job is simple:

Keep the bridge open.

But keeping it open too aggressively can destroy it.

WATCH THE BRIDGE

The bridge is divided into five structural zones.

Every vehicle adds load. Wind pushes the span sideways. Repeated stress damages cables and creates permanent deformation.

Watch each zone carefully.

When one begins approaching its limit, decide what matters more:

Keep traffic flowing — or close the gate and let the bridge recover?

ENGINEER WHILE IT IS STILL MOVING

Tolls from passing traffic fund your repairs and upgrades.

Buy and relocate physical supports during the storm:

  • Basic Supports
  • Reinforced Supports
  • Shock Supports
  • Heavy Supports
  • Storm Supports

Move hardware between zones as the pressure shifts.

Upgrade the bridge itself with stronger cables, a reinforced frame, flexible joints, faster gates, truck protection, storm forecasting, wind protection, recovery systems, backup cables and more.

TRAFFIC DOES NOT WAIT

The shift escalates through increasingly dangerous traffic:

Cars → Motorbikes → SUVs → Jeeps → Vans → Buses → Armored Vehicles → Trucks → Concrete Mixers → Heavy Freight → Tanks

Heavy vehicles pay more.

They also hit the bridge much harder.

Closing the gate protects the structure, but stopping traffic for too long can cause you to fail the shift through lost service.

THE STORM GETS WORSE

The night progresses from:

OPENING WATCH
to EVENING RUSH
to RAIN FRONT
to HEAVY TRAFFIC
to THUNDER LINE
to NIGHT'S WORST

Survive the final pressure and hold the span until dawn.

ENDLESS STORM

Survive the main shift to unlock Endless Storm.

No dawn.

No finish line.

Just an increasingly violent storm, heavier traffic, and the question of how long your bridge can keep standing.

CONTROLS

Mouse — interact with the bridge, supports, shop and gate
Drag supports — relocate installed hardware between zones
Space — open / close the traffic gate
Esc — pause

Published 17 days ago
StatusReleased
PlatformsHTML5
Authorbosniakk
AI DisclosureAI Assisted, Code

Leave a comment

Log in with itch.io to leave a comment.